WHAT WIRKSTAK DOES

WHAT WIRKSTAK DOES

See the job clearly, every day

WirkStak replaces the daily site diary. It captures the day as it happens, links it to your programme, and shows your whole team where the job stands.

Most site records are written to be filed and forgotten. WirkStak is built so the record does something for you while the job is still live — and stays reliable long after the work is done.

Most site records are written to be filed and forgotten. WirkStak is built so the record does something for you while the job is still live — and stays reliable long after the work is done.

Most site records are written to be filed and forgotten. WirkStak is built so the record does something for you while the job is still live — and stays reliable long after the work is done.

From that record you get a detailed as-built programme showing what was actually done and when, progress against the plan each day, and a structured record of every delay.

From that record you get a detailed as-built programme showing what was actually done and when, progress against the plan each day, and a structured record of every delay.

From that record you get a detailed as-built programme showing what was actually done and when, progress against the plan each day, and a structured record of every delay.

WirkStak site visibility visual

WHAT IT DOES

WHAT IT DOES

Eight things WirkStak gives you

01

Works with the programme you already have

You don’t rebuild your plan to use WirkStak. Bring in your P6, Microsoft Project or Asta programme, and every activity comes across with it. When the plan changes, bring in the revision.

Lock a baseline, so the plan you’re measured against can’t shift. From then on, everything your team records on site is set against the same programme your planner and your commercial team already know.

02

The right things, captured the same way

A traditional site diary lets everyone record differently — one supervisor notes the crews, the weather, and why work stopped; the next writes “quiet day.” WirkStak is built so the record doesn’t vary like that. Guided capture takes everyone through the same short set of questions, so the information a project actually needs is captured consistently, every day, rather than left to whoever’s holding the pen.

That consistency is what makes the record usable later: entries that can be compared across days, teams, and the whole project — and trusted, because they were captured to the same standard from the start.

03

Less admin, better records

The people best placed to capture what happened have the least time to do it. WirkStak is built for the reality of site — fast, guided capture, by tap or by voice, that fits into the day instead of stealing the end of it — so the record gets made without turning your team into administrators.

Cleaner records, produced with less effort. The work goes into building, not paperwork.

04

One version of what happened

The day’s progress, delays, photos and weather live in one connected record, instead of being scattered across diaries, camera rolls, emails and message threads. Anyone on your team who needs to know what happened on a given day can find it in one place, already in context. Every entry can be searched and filtered, across every capture area and every day. Any site day can be printed as a daily diary.

That’s less time lost chasing information weeks later, and a single account of events your whole team can rely on.

WirkStak progress visual

05

A programme that updates itself

Keeping a programme current usually means someone walks the site, then sits at a desk and updates every activity by hand. It’s slow, so the programme is often weeks behind the job.

With WirkStak, the progress your team records on site updates the programme overnight. If you have a planner, they spend their time planning, not re-entering progress. If you don’t, the programme stays current anyway.

06

See progress every day, not at month end

Each morning you see how the work is tracking against the plan, built from what your team recorded on site the day before. Each activity shows percentage complete, remaining working days and forecast finish, set against the programme. You can also see which activities are critical to the finish date.

That means fewer surprises and earlier decisions. And when you report up to your leadership team, you're reporting from the same solid record, not a story assembled the night before.

07

Catch programme slippage while you can still act on it

The early signs of delay show up on site long before they show up in a monthly programme update. Because progress is set against the plan every day, you can see which activities are running behind or haven’t started when they should have, and move before a small slip becomes an expensive one.

You can also see how long each activity took against its planned duration. An activity can start and finish late and still take less time than planned, and the record shows both.

Each delay and disruption is numbered and dated, with its timing, affected activities and linked photos. Problems caught early are cheaper to fix, and easier to explain later, because the record was made at the time.

08

A record that holds up when it’s questioned

Because the record is built as the work happens — consistently, in context, and clear about who captured what and when — it holds up when it matters. You don’t have to reconstruct the past from fragments, because the past was captured properly the first time. Entries are added, never overwritten, and original photos can’t be altered.

If a delay or dispute ever needs explaining, the evidence already exists — contemporaneous, structured, and linked to the plan. Not because you were preparing for a fight, but because you were running the job properly.

WHEN A PROJECT IS QUESTIONED

WHEN A PROJECT IS QUESTIONED

The evidence is already gathered

Project claims are often questioned months after the event and litigated later still, when memories have faded and people have moved on. The first job is working out what actually happened: gathering site diaries, photos and emails, and rebuilding an as-built programme from them. In our work as delay analysts, that takes weeks and is often one of the largest costs of a claim, before any meaningful analysis begins.


With WirkStak, the evidence is gathered as the job runs. You have a contemporaneous record of the whole project: progress, delays, photos and weather, each entry dated and attributed, and all of it searchable. Each delay has its own numbered record, with when it happened, which activities it affected and the photos taken on the day. The as-built programme is already there, built day by day from what your team recorded.


Your team spends less time reconstructing events from memory, and whoever prepares or responds to a claim starts from the facts.

Dusk construction site

What it’s not

WirkStak isn’t trying to run your whole project.

It’s not a project management suite, document control, cost management or procurement. Those systems have their place, and WirkStak doesn’t replace them.

WirkStak does one thing properly: it captures what happened on site, links it to the plan, and gives you a clear view of the job and a record you can rely on. Nothing you don’t need, and the one thing most projects are still missing.

Dusk construction site

What it’s not

WirkStak isn’t trying to run your whole project.

It’s not a project management suite, document control, cost management or procurement. Those systems have their place, and WirkStak doesn’t replace them.

WirkStak does one thing properly: it captures what happened on site, links it to the plan, and gives you a clear view of the job and a record you can rely on. Nothing you don’t need, and the one thing most projects are still missing.

Dusk construction site

What it’s not

WirkStak isn’t trying to run your whole project.

It’s not a project management suite, document control, cost management or procurement. Those systems have their place, and WirkStak doesn’t replace them.

WirkStak does one thing properly: it captures what happened on site, links it to the plan, and gives you a clear view of the job and a record you can rely on. Nothing you don’t need, and the one thing most projects are still missing.

Building something you’ll wish you’d had sooner

WirkStak enters beta in early 2027. Register your interest and we’ll keep you in the loop.

Building something you’ll wish you’d had sooner

WirkStak enters beta in early 2027. Register your interest and we’ll keep you in the loop.

Building something you’ll wish you’d had sooner

WirkStak enters beta in early 2027. Register your interest and we’ll keep you in the loop.